Hit "Enter" to search or "Esc" to close.

Skip to Main Content
  • Home
  • Exclusive Sale on Metso Spares and Wears!
  • Who We Are
    • Who We Are
    • About Duo
    • Our People
    • Quality
    • Environment & Sustainability
    • Equality, Diversity & Inclusion
    • Modern Slavery Statement
    • CSR
    • Health, Safety & Wellbeing
  • What We Do
    • What We Do
    • Plant Design
    • Manufacture & Installation
    • Contract Processing
    • Civil Engineering
      • All Civil Engineering
      • Earthworks
      • Remediation
      • Drainage
      • Highways
      • Reinforced Concrete
      • Projects
    • Earthworks & Remediation
    • Metso
  • Applications
    • All Applications
    • Aggregate Processing
    • C&D Waste Recycling
    • Food Produce Processing
    • Specialist Processing
  • Projects
  • Work For Us
    • Work For Us
    • Life at Duo
    • Vacancies
  • Seoul Ltd
    • Seoul Ltd
    • Seoul Product Range
  • News
    • All News
    • Newsletters
Get in touch
Duo Group PLC
  • Who We Are
    • About Duo
    • Our People
    • Quality
    • Environment & Sustainability
    • Modern Slavery Statement
    • CSR
    • Health, Safety & Wellbeing
  • Our Trusted Partners
    • Terex Washing Systems
    • Telestack
    • Metso
  • What We Do
    • Civil Engineering
      • Earthworks
      • Remediation
      • Drainage
      • Highways
      • Reinforced Concrete
      • Projects
    • Plant Design
    • Manufacture & Installation
    • Contract Processing
    • Earthworks & Remediation
  • Applications
    • Aggregate Processing
    • C&D Waste Recycling
    • Specialist Processing
  • Projects
  • Work For Us
    • Life at Duo
    • Vacancies
  • News
    • All News
    • Newsletters
  • Contact

Home / Projects / Nottinghamshire Recycling

Nottinghamshire Recycling

Duo Group

This totally self-contained plant has the flexibility to develop as market trends change.

Material source

C & D waste, green waste, wood and recycled aggregates.

Equipment used

GHT Gennaretti 503 variable speed centrifuge system.

Project requirements

To install a new, full washing and water management plant for Nottinghamshire Recycling Ltd (NRL) with the ability to divert recycled aggregates from landfill and supply high quality clean washed materials to the local construction materials market.

Duo's solution

To design and install a system where site material could be fed into a static Chieftain 1400 feed hopper, before having ferrous metal removed and being rinsed by a static rinser screen.

The plant would prove its ability to process materials considered difficult to recycle; would remove more sand and silt than previously achieved; sort graded materials appropriately; and integrate the technological capabilities of a Powerscreen Recycling Logwasher and Fines Master 120 unit to effectively produce up to 120 tonnes of contaminant-free sand and gravel.

Project success

By taking account of factors including silt content, clay content and the raw material settlement rate, the flocculent mixing and dosing system installed maintains a continuous supply of clean water and automatically mixes a batch of flocculent solution when the level drops. This totally self-contained plant has the flexibility to develop as market trends change and has delivered in creating a site previously considered as ‘not economically viable’ due to the cost of penalties.

Back to projects
Next Project
Duo Group PLC

There's always a way

  • Who We Are
  • What We Do
  • Applications
  • Projects
  • Our Trusted Partners
  • Work For Us
  • Health, Safety & Wellbeing
  • News
  • Terms and Conditions
  • Contact
Duo Group (HQ)

Duo Operations
Siskin Drive
Coventry
CV3 4FJ

t. +44 (0) 3330 382483
e. info@duogroup.co.uk

Social Media Icon Social Media Icon Social Media Icon
Website by Ripple Creative